Over the course of 2008/9,  and again in 2010/11, Polymathic delivered key expert witness analysis and deposition testimony on behalf of General Electric Co v. Mitsubishi Heavy Industries.  The results were a settlement of $170m in damages to General Electric Co.  Polymathic’s technology analysis pertained to software and hardware systems utilized in wind farm technology, including but not limited to:

  • FPGA based hardware systems
  • VHDL and Verilog based systems,
  • Computer source code (assembly, C, C++)
  • Overall system analysis and reverse engineering

A review of the matter can be found on Bloomberg.